Welded Duplex Pipe Case Study

Overview

Penn Stainless was asked to produce 30″ X 1″ wall x 14’ long welded tube for an engineering firm based in Richmond, Virginia with a required delivery time of 5 days.

Application

Marine Application, Direct Exposure to Salt Water spray

Delivery Requirement

5 Days

Task Summary

  • Delivered tested product in 5 days to the delivery site.
  • Pulled from large inventory of Duplex 2205 plate inventory to save on material sourcing lead times.
  • Involved Rapid Delivery team to ensure smooth flow through the Pipe and Tube Mill partner site.
  • Utilized X-Ray Non Destructive Testing on final product